4
Hot Insulation work for sulfuric acid equipments
1997-07-04 ~ 1998-10-20
SKEC(THAI), Ltd
NFC
3
Malays thermal power plant #1 & #2Hot Insulation work for piping and equipment in Malays' supply piping for crude oil
1997-04-01 ~ 1997-07-31
KEPCO Philippine Co.,Ltd.
Malays thermal power
2
Malays thermal power plant #2(200MW), Insulation replacement for piping
1996-12-01 ~ 1997-03-31
KEPCO Philippine Co.,Ltd.
Malays thermal power
1
Malays thermal power plant #1(200MW), Insulation replacement for piping and equipment
1996-09-01 ~ 1996-11-30
KEPCO Philippine Co.,Ltd.
Malays thermal power